亚洲精品一区二区三区精品,9久久国产综合精品成人影院,人妻制服丝袜中文字幕在线,亚洲av永久无码精品

Hello, welcome to Zhuo for air conditioning electromechanical official website!

_Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd

Electronic optics

Completion of medical science and technology purification project in Jiangmen

Author: Zhuo for air-conditioning purification Electromechanical Engineering Co., LtdPublished: 2018-03-19 14:26:11Views:2383

Completion of medical science and technology purification project in Jiangmen
The item company is mainly engaged in R & D, production and sales of medical instruments, equipment and high quality consumables. The company has a modern 100 thousand tier laminar flow net chemical plant, and has established an advanced product development center and material laboratory. At present, all products sold are independently researched and developed, and applied for domestic or international patent protection. The products are of high quality, reliability, high safety and users all over the country.
Project Name: purification workshop and laboratory renovation renovation project of Guangzhou Zhongda Furui Medical Technology Co Ltd (in part, structure, floor, duct part and water part and a lighting part containing air conditioning and equipment). It includes ten thousand and one hundred thousand levels.
The area of this project is about 1600 square, and the customer is required to finish 55 working days. The construction cycle is very urgent, through the overtime work of the master of the engineering master, it is finally completed in the time stipulated by the customer.
The following is to show the construction process of the project:

Early construction site:

After completion effect:

Details show:

Party B's responsibilities and obligations:
1. Party B is responsible for the construction of the project and the installation of air conditioning equipment, including air conditioning and equipment, structure, floor, wind pipe part, pure water part, lighting part.
2. after the completion of the project, the purification workshop must meet the requirements of the static 100 thousand level of the international standard test standard and be in charge of the commissioning.
3. laboratory area three rooms (positive control room, asepsis room, microbial limit room) must meet the requirements of international standard testing static ten thousand level indicators, and responsible for debugging in place.
Dongguan Zhuowei air conditioning electrical equipment Engineering Co., Ltd. is located in a developed economy, convenient transportation of Guangdong city of Dongguan Province, is a professional factory engaged in clean workshop, workshop building of constant temperature and humidity clean workshop, and central air-conditioning, electrical and mechanical engineering installation of the modern enterprise. The company was founded in 2003, has provided many enterprises with clean air conditioning design and installation, matching purification equipment, mechanical and electrical decoration, system maintenance and other services. Now the company has a large number of capable technicians, professional air conditioning designers, excellent after-sales service. In the long period of engineering practice, it has become a team of unity and innovation and strong cohesiveness.
Copyright (C) 2017 All rights Reserved. Zhuo for air-conditioning purification Electromechanical Engineering Co., Ltd. All rights reserved   粵ICP備001號  

Website statistics  |   Sitemap  

奉新县| 巴南区| 禹城市| 贵德县| 龙游县| 威宁| 永城市| 泸定县| 伊通| 白河县| 安顺市| 明星| 中方县| 通许县| 阿坝| 伊春市| 新津县| 安远县| 尼木县| 九龙城区| 保康县| 海淀区| 富锦市| 绥滨县| 历史| 岑溪市| 元阳县| 漯河市| 文化| 虞城县| 勐海县| 锦州市| 五指山市| 双柏县| 岳普湖县| 棋牌| 玉环县| 手机| 嵊州市| 萨迦县| 连山|